The owner of this 1923 Oakland Craftsman cared deeply about returning the home to its original glory—and RAYCO was proud to meet that challenge.
Following EPA Lead-Based Paint restoration standards and best practices, the team began by carefully protecting surrounding surfaces with plastic sheathing and wet-scraping the exterior. Once thoroughly scraped, the entire home received a complete prime coat to prepare it for patching. All patched areas were then tooled and sanded using HEPA-vacuum attachments for maximum safety and cleanliness.
After a second primer application over the repairs, the home was finished with two coats of premium paint—restoring both its beauty and its integrity.
Featured Projects
ALAMEDA
This 1901 Alameda Victorian arrived in severe condition and required extensive preparation and carpentry work.
RAYCO professionally scaffolded the home and performed heavy surface preparation across every exterior surface, including the installation of missing shingles and trim boards. Several gutters and downspouts were replaced, and a new laundry shelter was constructed.
Working in collaboration with a local designer, the team carefully preserved the home’s historic charm while maintaining a budget-friendly approach to the color scheme. After thorough patching, the surfaces received two full primer coats followed by two coats of finish paint—restoring both beauty and durability.