top of page
Featured Projects
MAXWELL
After the homeowner had the house professionally inspected for dry rot and termite damage, RAYCO was called in to open the walls identified in the report. Extensive damage to the framing was uncovered.
RAYCO carefully removed and replaced all affected framing, along with the entry cement stairs. Once structural repairs were complete, new waterproofing and stucco were applied, followed by the installation of new cement stairs. The project was finished with thorough surface preparation, priming, and two coats of elastomeric paint—delivering a durable, weather-resistant result.
From Start to Finish
bottom of page

























